The company’s mission is to discover and develop the new molecules and therapeutic strategies that will be able to represent the personalized care of the oncology patients, thus helping to shape the future of oncology.
For this purpose SCAM T.P.E. S.R.L. has recently finished, proudly, the “turnkey” assembly of a significant installation for this important reality. It is a complete system, made up of 2 batteries of evaporative towers equipped with skid for the water treatment controlled by PLC.
The first package battery, having a capacity equal to 5 thermal Mw, composed of 2 towers type TAS-UAS20-EU-HP-LN-S, satisfies the cooling of a line dedicated to chillers. The TAS cooling towers have in fact not insignificant skills required by the strict specification, such as low noise emissions and a corrosion-resistant quality of the materials used.
The second 12 thermal MW battery to be composed on site, has been realized with towers of a similar technology, type FAS-2LBS83-LP-S. The towers (4 cells in line divided into 2 portions each to be joined together) replace the old towers of field-erected type, now outdated.
A pretty good job at the side of those who fight for health.
SCAM T.P.E. S.R.L., in order to give continuity of service, also provided a rental tower type TAS-NBS23-BY-HP of 3,5 MW that during the activities (turnkey) gave continuity to the anti-cancer centre in its research activities.